|
|
|
Resume details
|
|
| Resume Title/Keywords: |
Area Manager, Design Engineer, Facilities Manager, Site Manager, Structural Engineer |
| Job category: |
|
| |
Available resume.doc or resume.pdf for download |
| Skill: |
Area Manager, Design Engineer, Facilities Manager, Site Manager, Structural Engineer
|
| Known languages(and levels): |
|
| Employement Type: |
- Full Time/Permanent
- Part Time/Short Term
|
| Salary: |
40000 USD
|
| Preferred Location(s): |
|
| Would like to relocate: |
yes |
| |
Other Information |
| |
| Education: |
Helper
Ref-Chem in Beaumont, TX.
February 2003 to May 2005
Gained experience in all aspects of gas and pipeline prodcution. And safety aspects of the job during construction and completion of gas plants.
Helper
S and N Communications in Ozark, Alabama
March 2000 to February 2003
Learned all aspects of underground cable and pipe location while installing both under and above ground telephone and fiber optic cable around gas, water, and existing electrical pipes and lines.
Strawboss, Pipefitter
Sunland Construction Inc. in Eunice, La. 70507
March 2008 to December 2008
Labor, overseeing jobs being performed and completed. Supervised seven to eight people on the job making sure the work was completed in a safe manner and up to standard and above company qualifications.
Being a team player on a job like this is a must, and my job was carried out with the utmost of care.
Farmer
RDG Farms in Headland, Alabama 36345
June 1995 to January 2000
Responsible for welding, cutting with a torch, brazing, soldering,operating heavy equipment, repairs on all farm implements, while overseeing and operating chicken houses.
Pipefitter/Foreman
J Five Seven Consruction in Coushatta, La.
December 2006 to January 2006
Overseeded various pipefitting and oversight of employees under my supervision, making sure that all aspects of the job was carried out in very safe and secure timeline.
|
| Degree: |
Associate
|
| Work Experience: |
Helper
Ref-Chem in Beaumont, TX.
February 2003 to May 2005
Gained experience in all aspects of gas and pipeline prodcution. And safety aspects of the job during construction and completion of gas plants.
Helper
S and N Communications in Ozark, Alabama
March 2000 to February 2003
Learned all aspects of underground cable and pipe location while installing both under and above ground telephone and fiber optic cable around gas, water, and existing electrical pipes and lines.
Strawboss, Pipefitter
Sunland Construction Inc. in Eunice, La. 70507
March 2008 to December 2008
Labor, overseeing jobs being performed and completed. Supervised seven to eight people on the job making sure the work was completed in a safe manner and up to standard and above company qualifications.
Being a team player on a job like this is a must, and my job was carried out with the utmost of care.
Farmer
RDG Farms in Headland, Alabama 36345
June 1995 to January 2000
Responsible for welding, cutting with a torch, brazing, soldering,operating heavy equipment, repairs on all farm implements, while overseeing and operating chicken houses.
Pipefitter/Foreman
J Five Seven Consruction in Coushatta, La.
December 2006 to January 2006
Overseeded various pipefitting and oversight of employees under my supervision, making sure that all aspects of the job was carried out in very safe and secure timeline.
|
| Experience: |
15 |
| Post Date: |
28/07/2010 |
| |
Contact Information |
| |
| Special offer: "You can get this personal profile with full contact details for 8USD". Click the link below to start! |
|
|
|
|
|